BIĀ 0020. Foundations and Framing

Units: 3
Formerly known as CET 20
Hours: 108 (36 lecture, 72 laboratory)
Fundamentals of construction foundation and framing techniques involving layout and construction to include, establishing elevations, site preparation, types of foundation forms, rebar and bolt installation, concrete placement techniques for slab on grade, cast in place (CIP), and pre-cast installations, structural steel, various types of floor systems, and applicable code requirements specific to the above. Introduction to California Green Technology and "Net Zero Energy" policies and sustainability practices for residential, commercial, and industrial construction. (CSU)